Read our selection of case studies to see how our solutions have increased the sustainability of Saudi Arabia's water and energy resources through innovative technology and engineering.
The existing system is obsolete where spare parts are no more available and proper maintenance became challenging which put the operation sustainability of SWCC in high risk.
The stability of control system became low because of old age of automation system which lead to lot of unknown failures in the existing systems.
The existing automation and SCADA system don’t have modern tools for tracing problem and faults which increase the process drop time and faults maintenance time.
Solution features:
ATC has success stories with the same client in similar applications.
ATC has been shot listed/prequalified based on field proven experience in other similar large size projects which was competitive covering all project scope.
ATC has provided aggressive price covering all project scope w/o deviations.
The project scope being “upgrade ” of a live critical system is required to be done with minimum shutdown where the system represent the most important water source to the central region of Saudi Arabia.
The system size is massive since it stretches over 1100 Km ( from Jubail to Riyadh and Riyadh to Qassem).
Client will have reliable and updated system for the pumping of desalinated potable water to the capital city of Saudi Arabia and also the important remote city of Qassem.
Operation efficiency will be increased due to the supplied monitoring & control system.
The client has less operational cost by decreasing required maintenance team depending on new maintenance tool and by decreasing maintenance time.